106.7 The Fan All News 99.1 WNEW CBS Sports Radio 1580

U.S. Naval Air Station Patuxent River

credit: ARIS MESSINIS/AFP/GettyImages

O’Malley: Not Convinced on Wind Turbine Moratorium

Gov. Martin O’Malley says he still has misgivings about a bill to set a 13-month moratorium on the development of tall wind turbines within 56 miles of the U.S. Naval Air Station Patuxent River base in southern Maryland.

04/07/2014